The production process of a 114 hot-rolled seamless pipe unit is as follows

01.Raw material preparation:

Prepare the raw materials for hot-rolled seamless steel pipes, including billets and alloy elements.

02.Heating:

Heat the billets to an appropriate temperature, usually above 1150°C.

03.Piercing:

Place the heated billets into a piercing machine to create a rough pipe.

04.Rolling:

Feed the rough pipe into a rolling mill and perform multiple passes to achieve the desired diameter and wall thickness.

05.Cooling:

Cool the rolled pipes gradually to reduce their temperature.

06.Sizing:

Process the cooled pipes to achieve precise diameter according to the specified dimensions.

07.Heat treatment:

Subject the sized pipes to heat treatment to improve their mechanical properties and microstructure.

08.Straightening:

Straighten the pipes that have undergone heat treatment to achieve a straight shape.

09.Inspection:

Perform various inspections on the straightened pipes, including visual inspection, physical property testing, and chemical composition analysis.
 

10. Marking and packaging:

Mark the qualified pipes and package them for transportation and storage.